Easy specification
We provide design and technical support
Sample service
Request sample boards, panels and more
Fast quote
Receive a quote within one working day
Delivery excellence
Trust us to fulfil your order on time, every time

What's included in a Tobermore Permeable Estimate?

Confidently plan your permeable paving and SuDS strategy

A Tobermore Permeable Estimate is a preliminary feasibility proposal that helps you assess the suitability of permeable paving for your development. SuDS, it provides the insights needed to evaluate your project with confidence before progressing to detailed design of your permeable pavement system.

01Tobermore product proposal

Discover tailored Hydropave product recommendations based on your project requirements. We’ll recommend the most suitable permeable paving products and sizes to support your proposed SuDS solution and help you progress with confidence.

 

02Hydropave Estimate Quantities

Receive an indicative breakdown of the materials required for your permeable paving system, together with typical construction details illustrating the recommended build-up for your proposed solution.

03SuDS storage proposal

Understand the storage capacity of your proposed SuDS system with a preliminary SuDS storage assessment, helping you evaluate how permeable paving can contribute to effective surface water management for your project.

04Preliminary structural overview

Explore the proposed structural construction of your permeable pavement system. This section provides a preliminary overview of the recommended pavement structure, including loading categories and typical construction build-ups.

05Preliminary hydraulic overview

See how your proposed permeable paving system will manage surface water. This section provides a preliminary hydraulic overview of the recommended drainage strategy, demonstrating how the system stores, treats and controls runoff in line with SuDS principles.

06Maintenance & long-term performance

Learn how your proposed Hydropave system is designed to perform over time. This section outlines the recommended maintenance approach and demonstrates how long-term hydraulic performance can be maintained through simple, routine surface maintenance.

07Working with us

Our support doesn’t stop once your Tobermore Permeable Estimate is complete. We’ll help you review your proposal, explore value engineering opportunities and guide you through the next stages, from tender support to formal design.

Request a Tobermore Permeable Estimate

Receive a complimentary preliminary feasibility proposal tailored to your project. Complete the form below and a member of our team will be in touch.

How can we help?

Request Quote

Request Sample